Saturday, November 24, 2007

Kidde Smoke Wont Stop Beeping

Travel wedding

Three weeks of vacation (4 weekends) will start from November 24 to December 16.



Friday, November 23, 2007

What Is Native American For White Paws

Boiler connection


We finally managed to get the connection to the gas. So we can start our boiler. For this, we start connections:


  • Connecting the outdoor thermometer that allows the boiler to adjust the heating temperature to the temperature outside and go to sleep automatically was


  • Connection indoor thermostat which currently is very limited

We light thus chaudrière for the first time and surprise ... it chauffre very quickly (too quickly) and stops for safety.

We discover later that the pumps are really stuck because it was not used for a long time. A small disassembly rule then allows them to work and so put chaudrière truly under way ...

Sunday, November 18, 2007

Pokemon Indigo How To Evolve Eevee Into Leafeon

Painting Room Southwest Room Painting

This weekend, Michael can not help us. The transport strikes, it has not the ability to move.

During the day Saturday and Sandrine Olivier worked attended the ASL of the subdivision. During that same day, Manu work the coating in the hallway and the entrance to the floor.

Sunday, everything is ready to attack the paint room southwest:

Sunday, November 4, 2007

Long Distance With Mattress On Roof

Southeast

This weekend we start the painting of the room facing South-East

and there, the first coat of paint Surprise! The color is not at all what we expected. We chose a beige palette that will ultimately prove to be a salmon. Nothing serious, just the disappointment of not having what we choose!


What to get: